How does Opcenter APS simulation power work?
Production sequencing is an issue that directly impacts factory productivity. However, sometimes the Production PPC lacks the best scheduling tools to simulate various scheduling scenarios based on industry priorities. With non-specialized tools, a lot of energy and time is spent creating this type of vision; with the right software, you can easily simulate scenarios and schedule and reschedule production in minutes in an optimized way. OPCENTER APS (formerly known as Preactor) was created precisely to solve this problem. The following video will practically demonstrate how to create three distinct scenarios for different priorities, and compare each scenario to determine the ideal one for your objective: shorter setup time, prioritizing customers, or delivery deadlines, ensuring that the PPC is always equipped with information and indicators to evaluate scheduling. Check out the video below! [embed]https://youtu.be/a4IKKhQcfc0[/embed] [noptin-form id=2822]