How the Opcenter APS solution reduced PCP effort by 60% at Induscabos

Posted in:
Share:
Share:

Learn how Induscabos, one of the largest manufacturers of high, medium, and low voltage electrical wires and cables in Brazil, implemented Siemens' Opcenter APS in partnership with NEO to optimize its production and overcome challenges in the electrical cable industry.

SCHEDULE A DEMO

Read the full case study now.

Download (PT)Download (en)

Induscabos Condutores Elétricos is one of the largest manufacturers in Brazil of high, medium, and low voltage electrical wires and cables. With a broad product portfolio, exporting to more than 15 countries, Induscabos stands out in the Energy, Oil and Gas, Mining, Steel, Agro-industry, Civil Construction, and many other sectors.

Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library

Real Companies. Proven results.

Reducing programming time

60% reduction in PCP's effort

Greater agility in production planning and control

Optimizing the programming process

Testimony:

“When searching for a solution on the market, we had a list of requirements. NEO not only fulfilled all of them, but also added new elements that enhanced the project, such as dynamic and assertive integration with our MES , with a view to evolving towards Industry 4.0 in the future.”

Want to see the full case study?

Sign up and access our exclusive members area and download the ebook with the full case .
Read the full case study now!
Download (PT)Download (en)