How Induscabos transformed planning & scheduling with Opcenter APS and NEO: 98% less time to generate orders, delays reduced by up to 20 days

Posted in:
Share:
Share:

Meet Induscabos, one of the largest manufacturers of high, medium and low voltage electrical wires and cables in Brazil.

SCHEDULE A DEMO

Read the full case study now.

Download (PT)Download (en)

Discover how Induscabos — a national leader in electrical wires and cables — revolutionized its production by implementing Siemens' Opcenter APS and NEO's Order Generator, automating critical processes, eliminating bottlenecks, and repositioning the company for new challenges and greater competitiveness.

Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library
Relume Library

Real Companies. Proven results.

From 30-day delays to deliveries within 10 days

Ability to plan and simulate complex scenarios in less than 10 minutes

Once dedicated solely to simple cables, today 31% of production focuses on high-complexity assemblies.

98% reduction in order generation time

Testimony:

New testimonials coming soon

Want to see the full case study?

Sign up and access our exclusive members area and download the ebook with the full case .
Read the full case study now!
Download (PT)Download (en)